Installation, Commissioning & Professional Handover
A controlled path from site installation and alignment to functional testing, operator handover and project documentation.
Correct installation protects engineered performance
A crane can only deliver its designed performance when installation, alignment, testing and handover are executed as a controlled technical process.
Site installation coordinated with the project
Installation activities are planned around the equipment configuration, runway conditions, access constraints and approved project documents.
Alignment before operational testing
Runway, bridge, travel assemblies and related interfaces are checked so motion systems operate without avoidable mechanical stress.
Functional checks and project-specific tests
Travel, hoisting, control and safety functions are verified before the crane enters normal operation.
Preserve commissioning records digitally
Inspection results, test records, equipment information and approved documents can be connected to the crane digital record.
Training at the point of handover
Operator and maintenance teams receive the relevant operating, safety and basic service information for the installed equipment.
Trace the route from installation to acceptance
Defined milestones make installation progress, open items, tests and handover status visible to the project team.
A structured commissioning record
The final record connects equipment identity, test status, open items, training and acceptance information.
Documents that support operation after handover
Approved drawings, manuals, test documents and relevant certificates should remain accessible after the installation team leaves site.
Commissioning questions
The exact installation and commissioning scope is defined by crane type, site conditions, project responsibility matrix and contractual requirements.
Plan installation and commissioning with ACG
Send site information, crane configuration and project schedule for technical review.