ACG ENGINEERING STANDARDS & QUALITY
ENGINEERING COMPLIANCE

Standards are part of engineering.

At ACG, a standard is not a decorative badge added at the end of a project; from duty-class selection and engineering through manufacturing, control and testing, standards are embedded in technical decisions and project documentation.

PROJECT REQUIREMENTS STANDARD SELECTION ENGINEERING VERIFICATION
STANDARDS FRAMEWORK

There is no single standard for every project.

The technical framework of each project is selected according to equipment type, duty class, capacity, operating conditions and contractual requirements. ACG uses multiple families of engineering standards to define design and verification requirements.

01 FEM

Duty Class & Mechanisms

An important reference for classifying crane mechanisms and defining requirements based on operating intensity and duty cycle.

DUTY CLASS
02 DIN

Industrial Design & Engineering

A family of technical references used for engineering design, mechanical components, manufacturing and industrial equipment requirements.

ENGINEERING
03 ISO

International Framework

International references for classification, design, quality, safety and documentation across industrial disciplines.

INTERNATIONAL
04 EN

European Requirements

European standards related to machinery, lifting equipment, safety, performance and product requirements.

SAFETY
05 IEC

Electrical & Control

Technical frameworks for electrical equipment, control systems, panels and machinery electrical infrastructure.

ELECTRICAL
06 CMAA

Crane Engineering

A specialized crane-industry reference for classification and engineering requirements of industrial crane systems.

CRANE
APPLICATION MATRIX

Where do standards enter the project?

Each standards family has a different role. Mechanism design, structure, electrical systems, lifting equipment and testing do not necessarily follow one reference; the technical framework must be selected for the specific equipment and project.

Engineering Area Reference Frameworks Project Application
01 Crane Design
FEM ISO DIN CMAA

Duty class, mechanisms, load cases and crane-system design requirements.

02 Structure & Mechanical Components
DIN EN ISO

Component design, manufacturing, tolerances and verification of project mechanical specifications.

03 Electrical & Control
IEC EN EN 60204-32

Electrical equipment, control panels, machine control and safety requirements for hoisting systems.

04 Lifting Equipment
EN 13155 FEM DIN ISO

Design and verification of below-the-hook equipment and specialized load-handling solutions.

05 Inspection & Testing
PROJECT SPEC EQUIPMENT STD.

Definition of inspection points, functional tests, load tests and project acceptance criteria.

06 Technical Documentation
ISO PROJECT DOC.

Drawings, inspection documents, test results and equipment handover documentation.

ENGINEERING LIFECYCLE

Standards enter the process from the start of the project.

The technical framework is not limited to final inspection. Project requirements must be transferred from the beginning into design, manufacturing, inspection and documentation decisions.

01 INPUT

Project Requirements

Capacity, span and duty class, environment and client requirements.

02 SELECT

Standard Selection

Selection of design references and project verification criteria.

03 ENGINEER

Engineering

Converting requirements into calculations, drawings and technical specifications.

04 BUILD

Manufacturing

Manufacturing in accordance with approved engineering documents.

05 VERIFY

Inspection & Testing

Verification of inspection points and equipment acceptance criteria.

06 DOCUMENT

Documentation

Recording documents, inspection results and handover technical information.

VERIFICATION & QUALITY

A standard without verification is only a reference on paper.

Technical compliance is meaningful when design requirements remain traceable through manufacturing and quality control. Inspection and test points are defined according to equipment type and project specifications.

DESIGN REQUIREMENTS BUILD CONTROL TEST VERIFY
01
Material Control

Material & Component Control

Verification of required component and material specifications against project technical requirements.

02
Dimensional Inspection

Dimensional Inspection

Verification of dimensions, geometry and critical points at defined manufacturing stages.

03
Welding Control

Welding Process Control

Verification of structural fabrication requirements against project specifications and documents.

04
Assembly Review

Assembly Review

Review of component integration and equipment preparation before functional testing.

05
Functional Test

Functional Test

Verification of mechanisms and electrical systems according to the project scope.

06
Load Test

Load Test

Execution of required tests according to equipment type and project acceptance criteria.

07
Documentation

Records & Documentation

Retention of technical documents and inspection results for handover and operation.

PROJECT-SPECIFIC COMPLIANCE

The final standard framework starts with the project itself.

Standards are not selected by product name alone. Equipment type, capacity, duty class, operating environment, safety requirements, client specifications and project documents all influence the technical framework.

01
Equipment Type

Equipment Type

02
Duty Class

Duty Class

03
Capacity & Geometry

Capacity & Geometry

04
Operating Environment

Operating Environment

05
Client Specification

Client Specification

06
Project Documentation

Project Documentation

ACG ENGINEERING NOTE The standards framework of each project is determined after reviewing technical specifications and actual operating requirements.
CERTIFICATES & DOCUMENTS

Quality and Standards Documentation.

Selected documents, certificates and records related to the quality system and frameworks used by ACG are presented in this section. The validity and scope of each document must be verified from the document itself.

ISO 9001 document in the ACG documentation set 01
QUALITY MANAGEMENT ISO 9001
CMAA-related document in the ACG documentation set 02
CRANE ENGINEERING CMAA
DIN-related document in the ACG documentation set 03
ENGINEERING STANDARD DIN

Displaying a standard or document on this page does not mean it automatically applies to every product or project; the scope of compliance for each project is defined by its technical specifications and project documentation and must be verified accordingly.

ENGINEERING REVIEW

Define the project standards before manufacturing begins.

For review of duty class, design standards, electrical requirements, testing or project documentation, send the initial specifications to the ACG engineering team.